top of page

Ekron River National Park Planning and Execution

Type of project: Extensive combined with Tourist projects

Area: 4,000 dunams

Master plan, declaration of the river and detailed plans for the implementation of about 40 km of river channels flowing in the territories of 6 regional and local councils. Planning, management, fundraising and close supervision of the implementation of about 16 km. The park will create connectivity between the areas of the councils, the park combines ecological restoration and the revitalization of the streams, creating ecological parks and slopes, creating tourist attractions and preserving the open areas for the benefit of future generations. The project is planned in collaboration with the Drainage Authority, the Brenner Regional Council, the Gezer Regional Council, the Kiryat Ekron Local Council and the Mezkeret Batia Local Council, the Hebel Yavne Regional Council and the Gedera Local Council.

Ekron River Bridge, including an observation area above the falls, at the planting event on Tu B'Shevat

2.jpg

The bridge over the Ekron Stream as a shaded classroom as part of the creation of the stream as a learning and research center for the children of the community.

נחל עקרון 2.jpg

Creating a protective embankment to prevent flood damage to the community's homes and to prevent flooding of agricultural fields

עקרון בית אלעזרי.jpg

Creating waterfalls, bank depressions, pools of various sizes, and observation hills as part of the structural complexity of the stream

עקרון בבית אלעזרי.jpg

Construction of a hybrid pool that combines tidal control and a winter pool

עקרון.jpg

Creating a seating area for outdoor classrooms and community events for residents of the settlement

אמפי לארועים ישוביים.jpg
Ekron8.jpg
Ekron9.jpg
bottom of page